The Difference Between Building Approval and Development Approval

In construction, navigating the bureaucratic maze of regulations and approvals can be daunting. Two key processes integral to any construction project are building approval and development approval.

While these terms might seem interchangeable at first glance, they represent distinct facets of the regulatory landscape, each with its requirements and implications. Understanding the difference between building and development approval is crucial for developers, architects, and property owners alike, as it can significantly impact the trajectory and success of a project.

Building Approval

Private Female Building Approval

Building approval is the official authorisation granted by local government authorities or private building certifiers for the construction, renovation, or alteration of a building or structure. It is a requirement for most building work as defined under the Building Act – all structures over 10m2 in area or 2m in height, change of building classification, fitouts of tenancies etc. The process ensures that proposed building projects comply with relevant building codes, regulations, and standards to safeguard public health, safety, and welfare.

The process of obtaining building approval typically involves several steps:

Submission of Application

An application is made by an owner, or architect or builder on behalf of the owner, to a building certifier for building approval. This application includes detailed plans, specifications, and other relevant documentation and consultant reports outlining the proposed construction project.

Plan Review and Assessment

Upon receiving the application, the building certifier thoroughly reviews the submitted plans and documents. This review evaluates the proposed projects compliance with the National Construction Code, The Queensland Development code, local government planning scheme, fire safety standards, structural requirements, accessibility standards, and other applicable laws and regulations.

Technical Corrections and Revisions

In many cases, the building certifier may request revisions or modifications to the submitted plans and reports to address non compliance with regulations. Other reports may be required to show compliance for site specific overlays, these may include bushfire management reports, slope stability assessments, or flood storage calculations.

Approval and Permit Issuance

Once the plans and other documentation are deemed satisfactory and all regulatory requirements are met, the building certifier issues the building approval. This approval is archived to the local government and is the official authorisation to commence construction activities within the parameters outlined in the approved plans. It will include conditions or stipulations that must be followed during construction.

Inspections

Throughout construction, the building certifier or appointed competent person such as the structural engineer will conduct site inspections to ensure the building work is carried out to the approved plans and applicable regulations. Inspections cover various aspects, including structural integrity, fire safety systems, and access for persons with disabilities.

Certificate of Occupancy/Final Inspection Certificate

Upon completion of construction, a final inspection is conducted to verify that the building meets all relevant codes and standards and complies with the approved plans. If the inspection is successful, a final certificate will be issued – dependent on the class of building a Form 21 Final Inspection Certificate or a Form 11 Certificate of Occupancy. This indicates that the building is safe for occupancy and complies with all regulatory requirements.

Development Approval

Private Development Approval

Development approval is the authorisation granted by local government planning authorities or governing bodies for proposed land development activities. It encompasses a broad range of activities related to the use and development of land, including but not limited to:

Subdivision

Dividing land into smaller parcels for residential, commercial, or industrial purposes.

Zoning Changes

Rezoning land to allow for different land uses or densities than what is currently permitted.

Site Development

Constructing new buildings, infrastructure, or amenities on vacant land, where a Material Change of Use application is triggered.

Land Use Changes

Altering the existing land use, such as converting agricultural land into residential or commercial developments.

Renovation or Expansion

Modifying existing structures or expanding them to accommodate new uses or increased capacity, where a Material Change of Use is triggered.

Environmental Assessments

Applications that involve environmental impact assessments to evaluate the potential effects of proposed developments on the natural and built environment.

Operational Works

Applications for works such as landscaping, driveway crossovers, civil works, changes to ground level.

Steps Involved in the Development Approval Process

Private Certifier

Development approval is governed by local planning regulations, zoning ordinances, and land use policies established by local government. The process of obtaining development approval varies depending on the specific council and the nature of the proposed development but can involve the following steps:

Pre-Application Consultation

Typically discussion would start with a private town planning consultant, and pre-application meeting may be held with the local government to discuss issues or concerns upfront, and to ascertain the level of assessment.

Application Submission

A formal application for development approval is submitted to the local government, accompanied by detailed development proposals, site plans, environmental impact assessments, and other required documentation.

Review and Assessment

The local government reviews the development application to assess its compliance with zoning regulations, land use policies, environmental considerations, and community objectives. This review may involve input from various stakeholders, including planners, engineers, environmental experts, and members of the public.

Public Consultation

In many cases, development applications are subject to public consultation processes, allowing residents, community groups, and other stakeholders to provide feedback or express concerns on the proposed development.

Decision Making

Based on the review process and public consultation results, the local government decides whether to approve, conditionally approve, or deny the development application. Approval may be subject to certain conditions or modifications to address concerns raised during the review process.

Appeals Process

Applicants or affected parties have the right to appeal to the local government decision through formal appeal mechanisms or legal recourse.

Implementation and Compliance

Once development approval is granted, applicants are responsible for implementing the approved development according to the conditions and requirements specified by the local government authority. It may involve obtaining additional permits such as building approval, adhering to construction timelines, and complying with ongoing monitoring and reporting obligations.

Building Approval and Development Approval Interdependencies

Private Residential Building Certifier

While building approval and development approval are separate approvals, they are inherently interconnected and overlap in practice. A successful construction project requires both types of approvals to be obtained sequentially or concurrently, depending on the specific requirements of the regulatory framework.

It is important to note:

  • Building approval may be possible to achieve for your design, but where you cannot get a development application approved, a building approval cannot be issued.
  • A development approval may be granted, but upon assessment the design may not be able to achieve compliance with building regulations.
  • Building approval assesses compliance with building regulations while development approval aligns with broader planning objectives.
  • It is often worthwhile to have your plans preliminarily assessed by a building certifier before lodging with local government under a development application.

Share THIS:

Facebook
Twitter
Pinterest
LinkedIn

We are currently taking expressions of interest for this product.

Please leave your name and email and will be in touch when this product is available for purchase.